Carmat SA - Going green and saving moneyCarmat's electricity costs were increasing at an astronomical rate, and frequent power supply interruptions was effecting their overall productivity.We assessed the property and set up a consumption metering system to gather as much data as possible.They had also purchased a 200Kva Cummins gen-set. Our engineering design integrated the generator set into the grid-tied solar solution. The design resulted in lower diesel costs during daytime power outages (the generator would only need to run at IDLE).Once commissioned, the solar yield offset a large portion of their electricity costs, and they successfully averted any further power interruptions, thereby restoring productivity and improving their competitive advantage.Thank you Wynand and your Carmat team for trusting us with your energy solution. .
The system
Our solar system was delivered with unparalleled professionalism by an exceptional design and installation team. The manner in which the Terawatt team conducted themselves and managed the project from start to finish could not be faulted.